• Services

………..Conceptual Design

………..Engineering

………..Procurement

………..Construction

………..Commissioning & Start up

………..Project Management

………..EPC, EPCC, EPCF

  • Fields of Work

………..Marine, Ports & Onshore/Offshore Facilities

………..Civil & Heavy Structures

………..Gas

………..Oil & Petrochemical

………..Dam, Water Transport /Water Irrigation & Environment

  • …… Others

………………Transportation

………………Infrastructural

………………Industrial

………………Mining

………………Nuclear Power Plants

………………Architecture and Urban Development

Tehran Berkeley Group of Companies has a long experience in site selection studies specially for nuclear power plants.

TB with its experts’ diversification was the first engineering house in the Middle East which was selected by the government in 1974 through a contract to do engineering and safety studies for Bushehr Nuclear Power Plants.

The TB’s nuclear team as a special division latter had contracts for Darkhovin (IRAN III & IV) Power Plants in 1975, Site Selection near Bandar Abbas in 1975.

After revolution of Iran in 1978, the TB’s nuclear team was reselected to perform its extensive site selection studies along the Persian Gulf and Oman Sea coastline which resulted in three sites for Nuclear Powers and Water distillation Plants.

Through these studies Tehran Berkeley Group of Companies was working with huge contractors such as:

  • Framatanre (France)
  • Ziemens (Germany)
  • Kraftwerk (Germany)
  • Union (Germany)

or partners including:

  • Motor Colombus (Switzerland)
  • Provy (Switzerland)
  • Stone & Webster (USA)
  • Tetra Tech (USA)

What will come in the next paragraph is a brief description of one of the most important projects in this field:

  • Site survey for nuclear power plants in Persian Gulf region

The aim of this project is to evaluate the potential of Iran’s territory for installation of 20000 MWe nuclear power plant. Henceforth in SNPI project the whole country is divided into 8 study regions which have been shown in the following figure.

In July 2008, Tehran Berkeley Group of Companies was authorized by the “Nuclear Power Production and Development Company” division of the “Atomic Energy Organization of Iran” to proceed with site survey for installation of nuclear power plant in PG Region in IRI (SNPI project, contract No:87/0404, Dated: 2008/7/12).

The studies henceforth performed to evaluate the potentials of the PG region for installation of nuclear power plants.

In the following stages:

  • Identification of Potential Areas :
  • Identification of suitable areas in PG Region.
  • Identification of Candidate Areas :
  • Identification of suitable areas in Potential Areas
  • Identification of Potential Sites :
  • Identification of suitable sites in Candidate Areas
  • Identification of Candidate Sites :
  • Identification of suitable sites in Potential Sites