(A) Recent sample projects: 

 

 -     EPC Contract for Kupal Supplementary Gas  Injection  Station ; Engineering, Procurement , Construction and Commissioning ; Client NISOC ; Awarded Mar.2011  (EPC)

  --   Consultant And Supervision for construction of south west/west Tehran province gas pipeline ‘ Client: NIGC ; Awarded Feb.2010

 -- Strategic Oil Concrete Storage Tanks ,Engineering Design & Construction Supervision (MC) ;Client : PEDEC ; Completed ---Dec.2009

-    Arak-Quom 26” Oil Pipeline Construction Supervision ; Client IOPTC ; Completed Nov.2009

-    Strategic Large-Scale Crude Storage Tanks for Iran ,Design Site Supervision & Management Contractor(MC) ; Client: NIOSC ; Completed.Sep2009

-     Construction of East Tehran 100000 Ton Silo (MC); Client: Ministry Of Jahad ; Awarded Aug.2009

-    Preliminary Study for Oil & Gas strategic terminal in Jask ; Client:NIOC , Awarded May.2009

-    Preliminary Study And Basic Engineering Design for Persian Gulf Oil Terminals ; Client : Kish Ports & Shipping Organization ; Awarded Oct.2008

-    Contract for Construction of Recycling Gasoil Vapors unit in Kan & Karaj (MC) ; Client : NIDC , Awarded Aug.2008

-  Strategic Oil Concrete Storage Tanks(MC) Engineering ,Design And Construction Supervision ;Client :PEDEC ; Completed Dec.2008

-  EPC Contract for Bibi Hakiemeh NO.1 Desalting Plant ; engineering studies , procurement services and construction works (EPC) ; Client NISOC ; Awarded Jan.2008

 -  Khoramshahr Copper Melting & Refinery (MC)  ; Client: NICICO ; Awarded Aug.2007

 - Preliminary And Basic Engineering Design for Khoramshahr Jetty Complex (1-9) ; Client : Ports & Shipping Org ( Khuzestan) ;Awarded Aug.2007

 -  Fajr Petrochemical Complex (MC) ;Client :NIPC ; Completed Aug.2007

 -  Alumina Handling Jetty Engineering & Construction Supervision for Al-mahdei Aluminum Ref. Complex awarded April 2007.

 -  Hydro-Electric Power Plant's Engineering for Tarik Dam in Rasht Gilan province, awarded April 2007.

 -  Chadormaloo Ore Mine Expansion Phase Engineering Design & Construction Supervision ;Client : MICMC Completed:Jan.2007

 - (MC) Abadan Refinery, the Management contract expansion project with two offices in Shiraz & Abadan awarded to TB & it has kicked off. Both offices have been established early August 2006.

 - Expansion & upgrading of Iron Ore & Material handling Jetty Engineering for Bandar Abbas minerals & steel free zone has started on Aug. 2006 by Tehran Berkeley.

 - Engineering Design Work & Consultant Supervision for expansion of Bandar Nowshahr eastern site area  ; Client: Ports & Shipping Org ; Awarded Jun.2006

 - Engineering & Supervision of Arak product pipeline (160 Km, 26" Diameter) awarded TB office in Arak has started the work for NIOC, as of April 2006.

 -  Tehran Berkeley North West Railway Main Bridges Rehabilitation Engineering Studies Project dated March 2006.

 - Chabahar new project Engineering & Supervision has been awarded to Tehran Berkeley on Feb. 2006. The cooperation started in different Engineering & Managerial work.

 - A technical cooperation contract has been signed between Tehran Berkeley & INPEX, Japanese Oil Company for Azadegan oil field in Feb. 2006.

 -  Tange Bijar & Kamankuh Gas Field Development in Ilam (EPC); Client: ICOC ; Completed: Mar.2006

 - EPC contract for Tabriz-Miandoab product pipeline & pumping station (EPC) valued about 20 million dollars contract with Tehran Berkeley as leader has been underway successfully with NIOC since Jan. 2006.

 - Consultant And Site Supervision for Bandar Nowshahr modification and expansion project ; client: Ports & Shipping Org ; Awarded Aug.2004

 -  City Of Mashhad Passenger Terminal, Design & Supervision ;Client : Mashhad Municipal ; Completed Jun.2004

 -  Kaveh Port Qushm Island ; Design and Construction Management :Client :PSO ; Completed Mar.2004

 -  South Pars Sulphur Export and Logistic Ports (EPC);Client NIGC ; Completed: Dec.2003

 -  Kharg Island Jetty’s Renovation (EPC); Client PSO ; Completed :Feb.2002

 -  Lavan Oil Terminal, Persian Gulf Study , Design And Construction Supervision ; Client: IOOC ; Completed:Jun.2002

-  Engineering Design For Kish Island Oil Terminal ,Pipeline and Storage Tank gas ; Client: Kish Free zone ;Compeleted:Mar.2002

- Engineering Design & Construction Supervision for Golestan Dam Project including pipeline /Pumping St. ;Client: Mazandaran Province WD ; Completed Mar.2000

 -  Engineering Design Work & Consultant Supervision for Zarabad fishing port construction ; client : Iran Shilat Organization ; Awarded Dec.2000

-  Imam Khomeini Port, Persian Gulf ,; Client PSO; Compeleted Mar.1994

 

- Design ,Construction and supervision of Port of Nowshahr,  Caspian Sea : Sheet pile jetty, 8m draft, oil carrier and general cargo vessels
Development of the old port, including study and design of breakwater extension, shore protection wall and onshore facilities, general engineering is in progress by TB.

Port of Bahman, Qeshm Island, Persian Gulf : Island’s main cargo, passenger & transportation port for 3,000 DWT general cargo vessel, 1150 m of break water develop Development of the existing port design of 500m of steel sheet piles as a new jetty, (130 m) extension of the main breakwater, onshore facilities.   

-  Bushehr Oil logistic port, Persian Gulf : The only port rendering logistic services to offshore fields in the Persian Gulf. Port design including finger jetties completed 1988. 

 

 (B)     Experience in definite disciplines.

Oil, Gas and Petrochemical

Mining and Exploration

Environmental Studies and Projects

Marine & Port Development and Construction

Civil and Structural Engineering

Industrial Engineering and Material Handling.

Management Information and Computer.

Transportation and Traffic Engineering (Airports, Roads, Railways).

Architecture and Urban Development.

Water resource Engineering – Water Supply and Dam construction.