- Port of Nakhilu's Offshore Operation Supporting Port Design -1982
| Iranian Offshore Oil Company |
- Bushehr Offshore Operation Supporting Port-1984 (Design & Supervision)
| Iranian Offshore Oil Company |
- Main Sea Island Construction Study for Oil Drilling "Caspian Sea"-1982
| N.I.D.C. |
- Preliminary Study of Jask Terminal for Oil Tankers up to 500,000 DWT-1985
| National Iranian Oil Company |
- Auxiliary Port and Major Kangan Port Project – 1987
| Kangan Natural Gas Project |
- SPM Loading Terminal (Taheri) for Condensate - 1987
| Kangan Natural Gas Project |
- Kangan Refinery (Geotechnical Drilling, Earthquake & Soil Mechanic Engineering)
| Kangan Natural Gas Project |
- Neka Breakwater and Terminal (Design & Supervision)
| N.I.O.C. |
- Repair and Upgrading for Lavan Oil Terminal in Persian Gulf for 320,000 DWT Tankers-1994
| N.I.O.C |
- Kangan Gas Pipeline to Airport and other facilities-1994
| N.I.G.C. |
- Fueling Station for Jam Airport 1994
| N.I.G.C. |
- B.I. Petrochemical Complex various engineering Services-1995
| N.I.O.C. |
- Nowshahr Oil Terminal-1995
| N.I.O.C. |
- B.I Petrochemical Complex M.C.
| N.I.P.C |
- Fadjr Petrochemical Complex M.C. and Supervision
| N.I.P.C |
- Subsea Foundation Engineering jack up Platform Rig "Caspian Sea"
| N.I.O.C |
- Bandar Abbas Refinery Berthing facilities
| N.I.O.C |
- South Pars Main port (EPC) contract in joint with Perlite
| N.I.O.C |
- South Pars Phase II and III
| Base Operation at Kish |
- Sirri Base Operation
| Base Operation at Kish |
- Reshadat Offshore Complex Renovation
| N.I.O.C |
- Resalat Offshore Drilling Rig R4 Manning & Management
| N.I.O.C |
- Nowrooz, Soroush various Engineering Procurement activities
As well as B.I. Logistic Base
| Shell |
- Central Zagross Oilfields site & facilities Survey
| Petrofina |
- Mehr Oilfield site & facilities oilfields
| Enterprise Oil |
- Asaluyeh Gas field Procurement & Engineering
| BHP |
- Sarvestan and Saadat Abad Oilfields
| Enterprise Oil |
- Ahwaz, AB-Taymour, Mansouri Site Survey & facilities investigation
| Shell |
- Sirri & South Pars Offshore Fields Various Services
| Total |
- Operation & Manning of Offshore Rig (R4) (1994)
| IOOC |
- Operation & Manning of Offshore Rig
| IOOC(Alvand) (2000) |
- Logistic base in Bandar Imam For Soroush & Nowrooz (2000)
| Shell (IOSC) |
- Logistic Base Bandar Bushehr (2001)
| Total |
- Logistic Base Khark Island (2001)
| Total |
- Lavan SPM Terminal (2001)
| IOOC |
- Soroush & Nowrooz topsides (2001)
| Shell (Naft Saze) |
Environmental Studies for Oil & Gas facilities in Khuzestan & Asaluyeh
| Shell |
Tange Bijar & Kamankuh Gas Field Development Project in Ilam. Management control under and EPC contract for gas separation facilities plants design in well heads field and Ilam refinery to process 175 MMSCFD gas in phase I.
| NIOC (ICOC) |
Laly Project It’s a feed package preparation contract for an EPC project which consists of 2 parts: 1. replacement of oil facilities which have been submerged due to the construction of Gotvand Dam. 2. Transportation and determining the path for the oil and gas to the South pf the lake created behind the Gotvand Dam.
| NISOC |